Home
Archives for February 2017
Reinforcement Checks
Reinforcement Cover:
It is essential that the steel reinforcement bars are surrounded sufficient impermeableconcrete to protect them from corrosion, and to allow the combined strength of the reinforcement and concrete to be effective.
Pre-Concrete Checks for Reinforcement:
The pre-concrete check for reinforcement essentially comes in two parts. The first part is a visual inspection by the clerk of works or equivalent.
It is essential that the steel reinforcement bars are surrounded sufficient impermeableconcrete to protect them from corrosion, and to allow the combined strength of the reinforcement and concrete to be effective.
Pre-Concrete Checks for Reinforcement:
The pre-concrete check for reinforcement essentially comes in two parts. The first part is a visual inspection by the clerk of works or equivalent.
COAGULATION - Definition and Measurement of Colloids
Many of the contaminants in water and wastewater contain matter in the colloidal form. These colloids result in a stable “suspension”. In general the suspension is stable enough so that gravity forces will not cause precipitation of these colloidal particles. So they need special treatment to remove them from the aqueous phase. This destabilization of colloids is called “coagulation”.
Subscribe to:
Posts (Atom)
Tags
architecture
Autocad
Bridges
Building
concrete
Construction
Cost estimate
Design of structures
DWG
Dynamic of structure
Earthwork
Final project report
Foundation
General Chemistry
np
Pictures
Practical tools
Road
Sanitation
site safety
Software
Spiral staircase
Stairs
Steel structure
Structural analysis
Traffic engineering
transportation
Water tank
xls